Foshan Demose Hardware Co., Ltd
Main products:Stairs, Railings, Fittings
Products
Contact Us
  • Contact Person : Mr. Lu Xiangfeng
  • Company Name : Foshan Demose Hardware Co., Ltd
  • Tel : 86-757-85951996
  • Fax : 86-757-85951997
  • Address : Guangdong,foshan,huangqi,NanhaiDistrict,Foshan,China
  • Country/Region : China
  • Zip : 528248

Tempered Glass Staircase (DMS-9004)

Tempered Glass Staircase (DMS-9004)
Product Detailed
1. tempered glass step 2. customized design available 3.steel plate stringer 4. best quality and material

Choose Us   Give Yourself a Different Life!

What you need to do is just give us the specific measurements or drawings or just the style you like, we can design for you and offer you proper price in 24 hours.

Our products are strictly tested and trial installation is necessary.

What makes us special is that we always listen to our customers and design

according to their requirements.

We always care safety, durability and quality with our more than 20 years experiences

 

DMS-9004 Spiral Tempered Glass Staircase

 

Components                

       Speficications                              

      Material                        

    Surface                   

stringer

 8/10/12/16mm plate,

centre column: dia114.4.0mm

 A3 steel/SS304/SS316

 baking/satin/

mirror

treadboard

12+1.52PVB+12mm

tempered glass

clear/frosted

fittings

factory standard

The materials of the treadboad can be wood, marble, stainless steel.

The specifications of treadboard and stair railing can be changed according to your requirement

 

Certifications:

a. Quality Management System Certificate

b. China Building Decoration Association Membership Certificate

c. China Council for the Promotion of International Trade Membership Certificate

d. China Association for Quality Inspection Qualified Product

e. China Building Decoration Association the Ministry of Construction Hardware Architecture Committee Products Selected Projects

Package:EPE, Air Bubble Film, PP bags, carton, wooden case

Delivery Time: 15-30 days after the deposit and drawing confirmation

Installation:

1. easy to install

2. screws and bolts are attached with the products

3. detailed installation drawings and instruction are provided

Payment: 50% T/T (or 30%T/T) in advance and balance before delivery

Terms of Delivery: EXW, FOB, CIF, CFR

 



Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.